Tag: Rahmedetalbrücke
Demolition of the Rahmedetalbrücke: “Three, two, one – ignition!”
Status: 07.05.2023 05:55 a.m 450 meters long. 70 meters high. 17,000 tons heavy. This is the colossus in numbers. 150 kilograms of explosives are supposed to bring down the dilapidated…
Rahmedetalbrücke on the A45 will be blown up on May 7 – news
The motorway bridge has been closed since December 2021. At that time, immense damage was discovered during a bridge inspection. The A45-Bridge has been considered in danger of collapsing ever…